Hilton Orlando

Project: Hilton Orlando
Structure: Institutionnelle
Location: Orlando, FL (USA)
Year: 2008
Tonnage: 775 tonnes

The hotel tubular structure design fits well with the concrete structure but adds to the steel detailing complexity with its irregular pieces and angled cutouts.